Crocker Park Pathway Renovation Project
The Work in general consists of the construction of pedestrian pathways, ADA ramp and parking striping and other such items of work as are required to complete the Project in accordance with this Contract, the Project Plans and Technical Specifications, and the 2018 Caltrans Standard Specifications.
Status
Bidding Closed
Bid Date | 2/8/24 2:00pm |
Location
Piedmont, CA